Chamber residential complex of two buildings is located in the prestigious area of Agios Tikhonas - one of the quietest and greenest residential areas of Limassol, near a natural stream and in complete isolation from the noise of the motorway. To the beach - 1 km, to the embankment of Amathus - 2 minutes, to the marina of St. Raphael - 5 minutes, to the center of Limassol and Limassol Marina - 15 minutes drive. The project is scheduled for delivery in the fourth quarter of 2027; buyers are available a phased payment during the construction period, as well as a reduced VAT rate of 5%.
The complex includes 12 spacious apartments with 3 and 4 bedrooms with a total area of 174 to 245 m2 with private gardens, as well as 2 exclusive penthouses with 4 bedrooms, Jacuzzi and roof terraces with a total area of 347 m2. Each unit is equipped with Italian kitchen furniture and wardrobes, engineered parquet, panoramic energy-efficient aluminum windows and Italian doors. The general infrastructure includes a pool with a lounge zone, a BBQ zone, a playground, European-made elevators and landscape landscaping with an auto-irrigation system.
All engineering systems of the complex are ready to connect a smart home (BMS): control of lighting, warm floors, air conditioning, curtains and hot water supply - everything is available from a single control panel. Heating is implemented through heat pumps with a water warm floor, hot water supply through solar panels with electric backup heating. The perimeter is guarded by video surveillance cameras, the entrance gate is equipped with an intercom and remote control.
Chamber residential complex of two buildings is located in the prestigious area of Agios Tikhonas - one of the quietest and greenest residential areas of Limassol, near a natural stream and in complete isolation from the noise of the motorway. To the beach - 1 km, to the embankment of Amathus - 2 minutes, to the marina of St. Raphael - 5 minutes, to the center of Limassol and Limassol Marina - 15 minutes drive. The project is scheduled for delivery in the fourth quarter of 2027; buyers are av...